Migration with Forms2Net


The migration process with Forms2Net
Migration Forms2Net
Migration Forms2Net

So that migration always runs smoothly and manageably, we have developed a process model which ensures that in each stage everything is thoroughly checked and optimally tested.

Step 1 - Migration Analysis

  • Analysis with the Forms2Net Analyzer

Analyzes the existing application, collects all statistical data and generates a report on the probable costs.

Step 2 - Migration Requirements

  • Definition Definition with the

The aims of the migration are defined together, from architecture, scope, timing, programming language and the installation of additional components through to costs.

Step 3 - Migration Process Evaluation

  • Prototype migration with Forms2Net

Working closely with the developers on the client’s side, a test run with part of the application can now be carried out in a workshop. Up to 100% active .Net code is generated there. The migration guide supports the integration of the program code.

Step 4 - Migration

  • With Forms2Net

Now the migration process begins with the Forms2Net converters while simultaneously documenting all migration processes.

Step 5 - Code Tuning

  • With Forms2Net

If necessary, the integration of the program is now carried out in accordance with the instructions from the migration guide. On occasion, it can also make sense to fine tune the user interface or optimize particularly critical tasks.

Step 6 - Application Acceptance

  • Testing by the client

Appropriate checks ensure that the functionality between the migrated application and the original application is agreed.

Step 7 - Production

  • Rollout for the client

The migrated application is put into operation.